New Pig Industrial Epoxy Repair Putty Trio | Leak Stop, Metal Rebuilding & Reinforcement

New Pig's essential plant maintenance epoxy putty trio: PTY201 Universal, PTY259 Multi-Purpose, and PTY264 Steel-Reinforced sticks. The all-in-one emergency toolkit for rapid leak sealing and equipment rebuilds.
Quick Selection & Compliance Summary (TL;DR): Complete emergency maintenance solution comprising three specialized New Pig epoxy formulations: Universal quick repair, chemical-resistant sealing, and NSF-certified steel reinforcement. Essential inventory for factory EHS compliance, preventing downtime and environmental citations.
Core Parameter Specifications & Performance Compliance Standards
Product Kit New Pig Industrial Epoxy Repair Putty Trio SOBLAR Industrial Maintenance Pack
Included Formulations PTY201 Universal + PTY259 Multi-Purpose + PTY264 Steel Covers plumbing, structural metal, and chemical tanks
Cure Performance Hand-kneadable, 20-min set, 60-min rock-hard cure No welding permits, hot work, or power tools needed
EHS Utility Stops chemical spills at source; prevents EPA discharge NSF 61, OSHA, and ISO 14001 audit compliant
Hazmat Response Compliance & FAQ:
Q: Why should factories stock the three-putty trio rather than a single type?
A: Different failure modes require specialized chemistries: PTY201 handles routine general leaks, PTY259 excels in chemical/acid contact, while PTY264 delivers maximum mechanical strength and potable water safety.
Q: How fast can emergency response personnel deploy these sticks?
A: In under 3 minutes. Simply cut off the required portion, knead until color is uniform, and wrap firmly around the leak.

【Product Overview & Engineering Highlights】

New Pig Industrial Epoxy Repair Putty Trio | Leak Stop, Metal Rebuilding & Reinforcement - SOBLAR

SOBLAR Co., Ltd. provides high-performance New Pig industrial epoxy repair putty for fast leak stopping, metal rebuilding, and structural reinforcement in industrial facilities.

【Key Technical Specifications & Compliance Advantages】

  • Product Kit: New Pig Industrial Epoxy Repair Putty Trio (SOBLAR Industrial Maintenance Pack)
  • Included Formulations: PTY201 Universal + PTY259 Multi-Purpose + PTY264 Steel (Covers plumbing, structural metal, and chemical tanks)
  • Cure Performance: Hand-kneadable, 20-min set, 60-min rock-hard cure (No welding permits, hot work, or power tools needed)
  • EHS Utility: Stops chemical spills at source; prevents EPA discharge (NSF 61, OSHA, and ISO 14001 audit compliant)

Engineered for demanding industrial facilities, semiconductor plants, chemical processing zones, and automated manufacturing lines, this solution helps EHS managers maintain strict regulatory compliance, prevent workplace incidents, and streamline routine safety audits.

1715458

Need Custom Spill Response Planning or Bulk Procurement?

SOBLAR provides complete plant HAZWOPER audits, customized spill response stations, and emergency drill guidance. Please contact our technical team via our Inquiry Board or directly:

Tel: +886-4-2281-6078  |  Email: service@soblar.com